Engineering Design Services 

Standard Foundation Repair:

  • Engineered plans from which contractors can bid: $2.5K

  • Note: a separate quote will be provided if we continue after contractor selection, total fees are generally 5% to 10% of the total project cost

Foundation Stabilization/Underpinning Design:

  • Pricing ranges from 5% to 10% of the total project cost

BEAR Engineering - Foundation Inspector
BEAR Engineering - Foundation Inspector

Past Engineering Design Projects

1/7

1/5

1/5

1/5

1/8

1/5

1/6

1/8

1/6

1/12

1/6

1/6
2015-01-20 12.35.35.jpg
2015-01-20 12.35.35.jpg

2015-01-20 12.27.13.jpg
2015-01-20 12.27.13.jpg

IMG_0379.JPG
IMG_0379.JPG

2015-01-20 12.35.35.jpg
2015-01-20 12.35.35.jpg

1/7
2015-01-26 13.45.22.jpg
2015-01-26 13.45.22.jpg

2015-01-21 13.04.26.jpg
2015-01-21 13.04.26.jpg

2015-01-26 14.19.34.jpg
2015-01-26 14.19.34.jpg

2015-01-26 13.45.22.jpg
2015-01-26 13.45.22.jpg

1/8
IMG_0161_edited.JPG
IMG_0161_edited.JPG

IMG_0171_edited.JPG
IMG_0171_edited.JPG

IMG_0136.JPG
IMG_0136.JPG

IMG_0161_edited.JPG
IMG_0161_edited.JPG

1/4
IMG_1440.JPG
IMG_1440.JPG

IMG_0143_edited.JPG
IMG_0143_edited.JPG

IMG_6029 copy.JPG
IMG_6029 copy.JPG

IMG_1440.JPG
IMG_1440.JPG

1/4
2013-09-26 10.34.49.jpg
2013-09-26 10.34.49.jpg

2013-09-26 11.30.49.jpg
2013-09-26 11.30.49.jpg

2013-10-22 10.30.21.jpg
2013-10-22 10.30.21.jpg

2013-09-26 10.34.49.jpg
2013-09-26 10.34.49.jpg

1/9
2014-06-10 14.05.41.jpg
2014-06-10 14.05.41.jpg

2014-07-10 15.57.50.jpg
2014-07-10 15.57.50.jpg

2014-06-10 14.04.49.jpg
2014-06-10 14.04.49.jpg

2014-06-10 14.05.41.jpg
2014-06-10 14.05.41.jpg

1/7
2015-01-19 10.13.33.jpg
2015-01-19 10.13.33.jpg

IMG_6287.JPG
IMG_6287.JPG

2015-01-29 15.05.04.jpg
2015-01-29 15.05.04.jpg

2015-01-19 10.13.33.jpg
2015-01-19 10.13.33.jpg

1/5
IMG_3049.JPG
IMG_3049.JPG

IMG_2773.JPG
IMG_2773.JPG

IMG_3194.JPG
IMG_3194.JPG

IMG_3049.JPG
IMG_3049.JPG

1/9

.......